Tell us the job
Grade, volume, slump, site access and your slot. We confirm a price in 30 minutes — no obligation.
Volumetric concrete mixed on-site across Richmond and North Yorkshire — pay only for what you pour, same-day where we can.
Trusted by contractors, councils & developers
Volumetric concrete delivered across Richmond and the DL10 area · nearest depot: Leeds depot (Hunslet, LS10)
Procon 24/7 supplies volumetric and ready-mix concrete to Richmond, Catterick, Brompton-on-Swale, Hipswell and the DL10 postcodes in Swaledale and around the Catterick Garrison area.
This is Dales market-town and military country, so the work runs from house extensions, garden rooms, garage bases and driveways in town to agricultural slabs, livestock yards and farm access roads up the dale, plus groundworks for the housing and garrison-area developments. Volumetric mixing batches on site so a long farm or hardstanding slab gets the exact volume with no part-load charge. Richmond is at the far north-western edge of our run, so we book it with lead time and keep same-day where we can — use the calculator and call 0190 459 3475 to confirm the grade and the slot.
Grade, volume, slump, site access and your slot. We confirm a price in 30 minutes — no obligation.
Our volumetric truck arrives with sand, aggregate, cement and water carried separately — nothing pre-mixed, nothing ticking.
Concrete is batched and mixed at your pour, to your exact grade. Need a different mix next? We switch on the spot.
The truck meters every cubic metre. You pay for the concrete that goes in the ground — no full-load minimum, no part-load penalty.
Ask away!
Volumetric concrete is mixed on your site by a mobile mixer that carries the raw materials separately. It is batched fresh at the point of pour, so you get exactly the grade and the volume you need, with nothing pre-mixed.
A drum wagon arrives pre-mixed — you pay for the whole load and race a 90-minute clock. Our volumetric truck mixes as you pour, so you pay only for what you use, there are no part-load charges, and there is no time pressure.
Yes. The truck meters every cubic metre mixed. If your job needs less than expected you simply stop — no full-load minimum and no charge for concrete you did not use.
Yes. Because the materials are mixed on site, one truck can switch between grades and mixes on the same visit — handy when a job needs, say, a footing mix and a floor mix.
Driveways and paths usually take C25, structural slabs and footings C30, commercial and heavy-duty work C35–C40. Tell us the job on the quote form and we will specify it for you.
Yes — our URS (Ultra Rapid Set) mix reaches working strength in around two hours, ideal for time-critical work like rail, highways and out-of-hours jobs. Ask for it when you request a quote.
Same-day where we can, fresh every pour, across Yorkshire and the North West.
Leeds · Bradford · York · Sheffield · Wakefield · Manchester · Liverpool · Preston · Huddersfield · Halifax · & every site in between