Tell us the job
Grade, volume, slump, site access and your slot. We confirm a price in 30 minutes — no obligation.
Volumetric concrete mixed on-site across Bolton and Greater Manchester — pay only for what you pour, same-day where we can.
Trusted by contractors, councils & developers
Volumetric concrete delivered across Bolton and the BL1–BL7 area · nearest depot: Warrington depot (Warrington, WA3)
Procon 24/7 supplies volumetric concrete across Bolton and the surrounding towns — the BL1 to BL7 postcodes from the centre and the Town Hall quarter to Halliwell, Farnworth, Westhoughton, Horwich, Bromley Cross and the Logistics North and Cutacre development areas off the M61.
Bolton's mix of housing regeneration, industrial estates and the big logistics parks brings steady work — foundations and oversite slabs, warehouse and yard slabs, plant bases, driveways, garage and workshop bases — with concrete pumping for tight terraced streets and the hillier outlying plots. Volumetric mixing means the exact volume with no part-load charge. Bolton is a comfortable run from our Warrington depot via the M61; same-day and next-day slots are usually available — call 0161 258 7732.
Grade, volume, slump, site access and your slot. We confirm a price in 30 minutes — no obligation.
Our volumetric truck arrives with sand, aggregate, cement and water carried separately — nothing pre-mixed, nothing ticking.
Concrete is batched and mixed at your pour, to your exact grade. Need a different mix next? We switch on the spot.
The truck meters every cubic metre. You pay for the concrete that goes in the ground — no full-load minimum, no part-load penalty.
Ask away!
Volumetric concrete is mixed on your site by a mobile mixer that carries the raw materials separately. It is batched fresh at the point of pour, so you get exactly the grade and the volume you need, with nothing pre-mixed.
A drum wagon arrives pre-mixed — you pay for the whole load and race a 90-minute clock. Our volumetric truck mixes as you pour, so you pay only for what you use, there are no part-load charges, and there is no time pressure.
Yes. The truck meters every cubic metre mixed. If your job needs less than expected you simply stop — no full-load minimum and no charge for concrete you did not use.
Yes. Because the materials are mixed on site, one truck can switch between grades and mixes on the same visit — handy when a job needs, say, a footing mix and a floor mix.
Driveways and paths usually take C25, structural slabs and footings C30, commercial and heavy-duty work C35–C40. Tell us the job on the quote form and we will specify it for you.
Yes — our URS (Ultra Rapid Set) mix reaches working strength in around two hours, ideal for time-critical work like rail, highways and out-of-hours jobs. Ask for it when you request a quote.
Same-day where we can, fresh every pour, across Yorkshire and the North West.
Leeds · Bradford · York · Sheffield · Wakefield · Manchester · Liverpool · Preston · Huddersfield · Halifax · & every site in between